
Operational capabilities
A service system designed before the first meal leaves the kitchen.
Reliable catering depends on coordinated procurement, production, people, logistics, site readiness, and review—not one isolated kitchen moment.
Illustrative brand imagery — not a ZAD facility photographOperating model
Every handoff matters.
We approach each requirement as a connected operating system. The proposed model defines ownership, controls, timing, dependencies, and escalation paths before mobilisation.
01
Menu and production planning
Translate the service brief into menu cycles, production schedules, portion logic, and delivery windows.
02
Procurement coordination
Plan approved inputs, ordering rhythms, receiving requirements, and supply continuity around the menu.
03
Mobilisation planning
Sequence staffing, training, equipment, site access, trials, and communication into a controlled launch.
04
Service review
Use agreed service observations and client feedback to identify practical adjustments.
Our people · Reported 10 October 2026
The team behind every service.
A company-wide workforce spanning culinary production, site operations, service and support. These are reported employees—not staff reserved for a new contract.
- 158
- Reported staff
- 168
- Approved positions
- 10
- Vacant positions
Daily ceiling: around 30,000 meals and more
Our daily ceiling is around 30,000 meals and more, delivered three ways: cooked in our own kitchens and delivered daily, prepared in your company kitchen by a team we build on site, or in a new kitchen we build and equip where space is available. The volume, start date and team for each site are agreed in the contract.
A clear path to expansion
The approved structure has 10 vacancies: 5 cooks, 4 servers and 1 hygiene officer. Filling them would bring staffing to 168. These positions are not an immediately deployable reserve; any further expansion and start date require an agreed mobilisation plan.
Source: owner-supplied manpower summary · 10 October 2026. A workforce snapshot, not a deployment guarantee.
Discuss your volume and start dateCapability chain
One plan from source to service.
- 01
Plan
Convert scope, demand, site constraints, and standards into an operational model.
- 02
Prepare
Coordinate menus, supply, production, staffing, training, and service readiness.
- 03
Control
Apply defined checks across receiving, preparation, holding, dispatch, and service.
- 04
Improve
Review agreed measures and diner feedback without disrupting service continuity.
Evidence position
Verified facts will replace broad promises.
The historic profile refers to production and storage capacities that require current documentary confirmation before publication.
This transparent position protects procurement teams from relying on outdated claims.
- Current capacity pending verification
- Current facility status pending verification
- Fleet and coverage pending verification
- Approved evidence required before launch
Capability questions
What will be confirmed during qualification.
Need to test operational fit?
Share your sites, volumes, shift model, and target date for a structured capability discussion.
Enquiries will open after official contact details are approved.